Thursday, May 15, 2025

Creating liberating content

Introducing deBridge Finance: Bridging...

In the dynamic landscape of decentralized finance (DeFi), innovation is a constant,...

Hyperliquid Airdrop: Everything You...

The Hyperliquid blockchain is redefining the crypto space with its lightning-fast Layer-1 technology,...

Unlock the Power of...

Join ArcInvest Today: Get $250 in Bitcoin and a 30% Deposit Bonus to...

Claim Your Hyperliquid Airdrop...

How to Claim Your Hyperliquid Airdrop: A Step-by-Step Guide to HYPE Tokens The Hyperliquid...
HomeSportsTrain traffic on...

Train traffic on the bridge was restricted on April 25 due to the collapse of the contact network

According to information available on the Fertagus website, train services on the 25 April Bridge, which connects Lisbon to the south bank, returned to normal at 5:00 a.m. after being restricted due to a catenary fall.

According to Fertagus, the company that runs the service, the catenary collapsed at 5:30 p.m., with service stopped on the descending route between Sete Rios and Alvito A in Lisbon.

The movement was carried out in both directions along the ascending route between the indicated stations.

This rail link between Lisbon and the South Bank was opened on 29 July 1999, with the aim of removing cars from the 25 April bridge.

The passage connects the Roma-Areiro stations in Lisbon with Setúbal and has 10 stations on the south bank and four in the capital.

On a railway, the contact network is an overhead system for distributing and supplying electrical energy.

Author: Lusa
Source: CM Jornal

Get notified whenever we post something new!

Continue reading