Tuesday, October 28, 2025

Creating liberating content

Introducing deBridge Finance: Bridging...

In the dynamic landscape of decentralized finance (DeFi), innovation is a constant,...

Hyperliquid Airdrop: Everything You...

The Hyperliquid blockchain is redefining the crypto space with its lightning-fast Layer-1 technology,...

Unlock the Power of...

Join ArcInvest Today: Get $250 in Bitcoin and a 30% Deposit Bonus to...

Claim Your Hyperliquid Airdrop...

How to Claim Your Hyperliquid Airdrop: A Step-by-Step Guide to HYPE Tokens The Hyperliquid...
HomeWorldIn Tomsk, the...

In Tomsk, the reform of five schools is delayed

In Tomsk, the reform of five schools is delayed

The Tomsk administration cannot announce tenders for the search for contractors for the repair of 4 schools, since the design and estimate documentation (DED) of the premises is still under examination, and for school No. 5 they will be looking for a new contractor , since the chosen one refused, I said. o Mayor Mikhail Ratner during a meeting of the City Duma on February 7.

The projects for the reform of 4 schools are being examined, the comments are corrected daily. Documentation expected soon.

“The deadlines that the ministry has set for us are quite strict. The task is to announce contests in the near future”Ratner says.

According to him, the contractor selected for the repair of school No. 5 refused to carry out the work and relates it to a poorly prepared estimate, due to changes in prices and rates.

Ratner believes that the task must be completed before the end of this year: the budget needs to be changed, bids must be announced and the renovation of the school completed.

He clarified that for the moment repairs have begun at school No. 38.

Also in the plans of the city administration, for the current year, to prepare a design budget for the repair of 11 more schools: these are schools No. 3, 11, 23, 25, 33, 34, 40, 67, gymnasiums No. 26, 56 and boarding school No. 1.

The city budgeted 63 million rubles for the execution of these works, and the region should add 71 million, however, the sum of all design and estimate documentation exceeds 160 million rubles.

In this regard, the construction department of the city capital is looking for ways to optimize these processes.

Recall that earlier it was announced that in the Tomsk region there are only 467 school buildings, of which 103 are 70% worn out, and 242 educational institutions – 50%.

The overhaul of 23 schools was planned for the academic term of 2022 and 2023 for a total of 2.2 billion rubles. At the same time, in 2023, it was planned to repair 7 school facilities in Tomsk: schools No. 5, 14, 22, 30, 38, 49 and the Physics and Technology Lyceum.

Source: Rossa Primavera

Get notified whenever we post something new!

Continue reading

The head of the Abkhazian Foreign Ministry assessed the relations between Russia and Georgia

It is in Abkhazia's interest to develop relations between Russia and Georgia, Abkhaz Foreign Minister Sergei Shamba said at a briefing on September 3."I think it is in our interest to see things develop normally. I do not believe...

The head of the Abkhazian Foreign Ministry called on the Russian Federation to consider how to improve relations with the Russian Federation

Abkhaz political forces need to think together about how to improve relations with Russia, which have begun to deteriorate, Abkhaz Foreign Minister Sergei Shamba said at a briefing on September 3.He commented on a document that appeared on social...

Sports Minister Degtyarev punished a State Duma deputy for changing citizenship

State Duma deputies who previously changed their sports citizenship are disgusting, Russian Sports Minister Mikhail Degtyarev said on September 4 during a speech at the EEF-2024 forum.Degtyarev said he was not against Russian athletes taking part in international competitions...